From order confirmation to a loaded container: the checks before an agrochemical shipment leaves China

An agrochemical order passes through label approval, production, batch documents and dangerous goods packing before it can sail. This is how Huasheng runs each step, and what the IMDG Code and Chinese maritime rules require of the shipper.

Huasheng Bio4 min read
Key points: Each procurement project at Huasheng has one contact who coordinates the specification, samples, documents, packaging and delivery. The label artwork is approved by the customer before production, and the usual lead time of 25 to 40 days runs from order confirmation and label approval. Pesticides that are dangerous goods are packed, marked and documented to the IMDG Code, and Chinese rules add packaging inspection certificates and a signed container packing certificate.

For a buyer, the weeks between signing an order and receiving a bill of lading can feel like a black box. This article opens it: what happens at each stage, who is responsible, and which documents come out of it.

1. One project, one contact

Each procurement project is handled by one Huasheng contact, who coordinates the specification, samples, technical documents, packaging and delivery. The customer does not have to chase separate departments for a label proof, a certificate and a booking.

2. Label and packaging are approved before production

Pack size, material, closure and label version are chosen with the formulation and its stability data in mind, and the order states the storage and transport conditions, batch marking and shelf life information. The label artwork is approved by the customer before production starts. FAO and WHO labelling guidance asks for each lot to be identified in plain numbers or letters and for the release date to be shown [3], so these fields are fixed on the approved artwork rather than added at the last minute.

3. Production and the check before release

Products come from Huasheng's own production or from partner factories in China, always to the same agreed specification. Before delivery we confirm with the manufacturing partner, item by item, the product name, composition statement, formulation, specification, pack size and batch identification, and the certificate of analysis is checked against the specification limits.

4. Dangerous goods packing and marking

Many pesticides are dangerous goods at sea. Under the IMDG Code, the shipper classifies the goods [1], and the packaging must be strong enough for the shocks and loads of normal transport and closed so that nothing leaks through vibration or changes in temperature, humidity or pressure [1]. UN specification packaging carries a mark whose letter shows the packing groups it is approved for: X for groups I to III, Y for II and III, Z for III only [1].

  • Each package shows the UN number and proper shipping name, with the hazard labels for its class, and the marine pollutant mark where it applies [1].
  • Each container carries placards on both sides and both ends [1].
  • Since 1 March 2025, Chinese rules require dangerous goods packaging to hold inspection certificates, and an on site inspector signs a container packing certificate once the packing meets the national standard GB 40163 [2].

5. The documents that travel with the goods

Before loading, the shipper in China submits to the carrier, and reports to the maritime authority, a declaration of safe carriage, the safety data sheet, the packaging inspection certificates and, for containers, the container packing certificate [2]. The IMDG Code requires a signed dangerous goods transport document that lists the UN number, proper shipping name and class, and identifies marine pollutants [1]. Alongside these, the order documents prepared by Huasheng include the batch certificate of analysis, the safety data sheet for the formulation, packing information and the commercial documents, all carrying the same batch numbers.

6. Usual commercial terms

Huasheng usual terms; each quotation confirms the terms of that order

ItemUsual terms
Minimum orderFormulations from 1,000 L or 1,000 kg per specification; technical material from 1,000 kg; samples and registration trials below the minimum
Lead timeUsually 25 to 40 days after order confirmation and label approval
Shipping termsFOB, CFR or CIF from a Chinese port
PaymentT/T or irrevocable letter of credit at sight
Lead time and documents are confirmed in each quotation. Approved uses differ by country; the label registered in the destination market applies.